< All case studies
Case study · Laboratory fit-out

Two lab suites built inside an operating research center.

The Pennsylvania Biotechnology Center campus in Doylestown, home to Labs 9 and 10
The Pennsylvania Biotechnology Center. Doylestown, Pennsylvania.
Location
Doylestown, Pennsylvania
Client
Pennsylvania Biotechnology Center
Program
Labs 9 and 10: one large open lab with mobile casework and multiple sinks, a tissue culture lab, and two offices
Completed
Design services completed January 2025
Architect
Steven S. Cohen, Architect, PC
MEP engineer
Hofmeister Engineering, P.C.
Electrical engineer
Mulhern Consulting Engineers

The challenge

The Pennsylvania Biotechnology Center needed existing second floor space turned into lab suites ready for a biotech tenant, without disrupting the companies already at work in the building. The new tissue culture lab sat directly above a first floor tissue lab, so every system had to tie into what was already there.

Our approach

We laid out Labs 9 and 10 as one large lab with mobile cabinets and multiple sinks, so the tenant can reconfigure benches as its research changes, along with a dedicated tissue culture room and two offices. Architecture, HVAC, lab plumbing and piping, fire sprinkler, and electrical were coordinated in one set, with tie-ins to the existing service, lab equipment connections, lighting, and fire alarm devices planned around the lab layout.

The result

Permit and construction documents for flexible, code compliant lab space, with our design work completed by January 2025. The center now has move-in ready labs it can lease to growing life science companies.